Available options depend on your version, permissions and hardware. For missing actions, see Security and Diagnostics.
Step by step
- Begin with Energy for the installation and Equipment for connections.
- Use History, Battery, Alarms and Reports once readings are available.
- Open System for settings and choose your preferred theme, language or view.


Options explained
- Energy
- multi-inverter installations provide a summary and individual equipment views.
- History and Reports
- inspect past data without changing equipment.
- Automations and Energy plan
- start with simulation or recommendations before enabling control.
- Help
- restart the guided tour in System > General. Fullscreen and theme only affect presentation.
Troubleshooting
A missing button may reflect your role or hardware rather than a fault. On mobile, open the menu to change screens.
Common problems