The plan estimates the next 24 hours from forecasts and constraints. Start in advisory mode.

Available options depend on your version, permissions and hardware. For missing actions, see Security and Diagnostics.

Step by step

  1. Generate/regenerate and check date, confidence, actions and explanation.
  2. Set objective, battery reserve, risk and grid-import limit; save.
  3. Simulate EV power and start/end hours without acting on equipment; compare with baseline.

Options explained

Objectives
balanced, self-consumption, cost, autonomy, battery reserve, peak shaving or EV priority change the optimization.
Reserve/limit
SOC is percent; grid import is W and 0 means no limit.
Conservative
plans more cautiously; low confidence or missing data reduces usefulness.
History
compares past plans; a recommendation does not confirm execution.

Troubleshooting

Check readings and forecasts for missing plans. Simulated savings depend on assumptions, weather and actual usage.